Commissioning and testing of the A35 on the Utopia of the Seas.
Our priority is to catch up on the assembly and manufacturing delays of the A35, the only LNG-powered unit, in order to meet the delivery deadlines.
-
Testing and commissioning of the gas propulsion system.
Our mission is to carry out the testing and commissioning of the Ilma yacht’s gas system up to HAT for Ritz-Carlton.
-
Construction of a river transport link.
Our mission is to manage the Seine–North Europe project contractually: acting as project management (MOE), conducting risk analysis, and optimising performance for a strategic inland waterway link.
-
Support and reinforcement during a technical shutdown period.
Our objective is to support the BEM Monge during its 2024 technical shutdown in order to restart auxiliary systems.