Commissioning and testing of the A35 on the Utopia of the Seas.
Our priority is to catch up on the assembly and manufacturing delays of the A35, the only LNG-powered unit, in order to meet the delivery deadlines.
-
Testing and commissioning of the gas propulsion system.
Our mission is to carry out the testing and commissioning of the Ilma yacht’s gas system up to HAT for Ritz-Carlton.
-
“Banc de Guérande” project, the first offshore wind farm project in France.
Our role is to manage and coordinate the “Combined Tests” for the Banc de Guérande offshore wind project.
-
Construction of a data centre.
Our role is to coordinate technical systems (HV/LV electrical systems, HVAC, mechanical systems) to ensure safety, performance, and compliance in Equans projects.
-
Energy transition of the Albioma Le Gol power plant.
Our objective is to convert the thermal installations of the Albioma Le Gol power plant to 100% biomass combustion, in compliance with applicable standards.
-
Replacement of a power plant.
Our role is to replace the Vazzio power plant with a 130 MW biomass power plant in Ajaccio, a 100% renewable advancement in line with the Corsican PPE (Multiannual Energy Plan).
-
Construction of a river transport link.
Our mission is to manage the Seine–North Europe project contractually: acting as project management (MOE), conducting risk analysis, and optimising performance for a strategic inland waterway link.
-
Boiler conversion for fuel switching.
Our mission is to secure the operation of new local biomass combustion systems in Réunion Island.
-
Extension of the ERENA district heating network.
Our role was to coordinate the extension and connection of the networks, optimizing the performance of biomass boilers.